Friday, June 22, 2007
Kitchen Progress
Rachael has continued to closely draft kitchen cabinet installation with kithen cabinet stocking. The cabinets have a lot more work ahead, but that hasn't stopped her from moving all of our condiments, cereals, bowls, cups and utensils into any cabinets with working drawers or doors.
The refrigerator, dishwasher, sink, disposal and built-in microwave are installed and (mostly) working.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment