Monday, April 30, 2007

Deck Framing


Today the crew completed the main deck and front porch beam layout and started filling in with joists.

Sun Dial


The crew hones its record keeping skills over lunch.

Hot, Cold and Primer Lines


Hookups for the hot and cold lines for the kitchen sink are in. The feed on the right is the primer line for the bathroom floor drain, which is about ten feet away. Floor drains require primer lines which periodically wash the drain out and help avoid sewer gas buildup. The primer line is here instead of the bathroom because of space issues.

Floor Fixtures


The floor fitting for the toilet (right) and the floor drain (left) are installed in the bathroom. The tiles will slope slightly toward the drain, which will catch overspray from the tub's hand shower.