Monday, April 30, 2007
Deck Framing
Today the crew completed the main deck and front porch beam layout and started filling in with joists.
Hot, Cold and Primer Lines
Hookups for the hot and cold lines for the kitchen sink are in. The feed on the right is the primer line for the bathroom floor drain, which is about ten feet away. Floor drains require primer lines which periodically wash the drain out and help avoid sewer gas buildup. The primer line is here instead of the bathroom because of space issues.
Floor Fixtures
Subscribe to:
Posts (Atom)