The East wall again, now with siding and studs cut out to make room for the kitchen bump-out. The tarp is obscuring some of the opening in this photo. The bit of siding peeking out from behind the tarp is a thin section which has the electric meter still attached. The electrician is visiting the site today to move wiring around so the crew can continue with the framing.
Friday, March 16, 2007
East Wall, Opened Up
The East wall again, now with siding and studs cut out to make room for the kitchen bump-out. The tarp is obscuring some of the opening in this photo. The bit of siding peeking out from behind the tarp is a thin section which has the electric meter still attached. The electrician is visiting the site today to move wiring around so the crew can continue with the framing.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment